Nora NHM2-415LE6EM 4″ Marquise II COB Non-IC New Construction Housing with Emergency – 120-277V
Dedicated new construction housing for installation in Non-IC or insulated ceilings, must specify. Air-tight construction provides energy savings by reducing the flow of air through the ceilingFeatures:Lead Time: Usually 2-4 weeks for assembly Housing only
$147.00
$366.48
Reviews
There are no reviews yet.